Hamburger
Icon Submission of meter reading Icon Switch supplier Icon Our contact
Back
Submission of meter reading

Still don't have a reader, which submits your consumption remotely? You can submit your realized monthly consumption via Moj GEN-I or SMS.

Switch supplier

We arrange everything to switch your supplier in your name. All you have to do is send us the details and choose how to sign the contract.

Our contact
Monday–Friday: from 8 a.m. to 8 p.m. Saturday: from 8 a.m to 2 p.m. Sunday and holidays: closed
HOUSEHOLDS / ELECTRICITY / TABLE OF MINIMUM QUALITY STANDARDS

Table of minimum quality standards

Medium-voltage level (MV), direct connection of customer to the MV outlet of the transformer station

Transformer station/substation outlet on the MV network Total duration of unplanned sustained outages Total number of unplanned sustained outages
Rural area 480 6
Mixed 180 5
Urban environment 180 4

 

Low-voltage level (LV), indirect connection of customer to the LV outlet of the transformer station

 

Transformer station/substation outlet on the MV network Total duration of unplanned sustained outages Total number of unplanned sustained outages
Rural area 960 16
Mixed 400 10
Urban environment 400 8